The first villa is (almost) complete…

Posted by Mikaela (Morocco based) on September 16th, 2009 · 2 Comments so far

I’ve been slack and am long overdue for a blog post. To be fair, I have actually been really very busy, along with the rest of the team. Does that count as an excuse for the lack of blogging?
But the good news is…we have finished Villa 5! Can I tell you that, due to deadlines [...]

[Read the full article →]

Categories: Construction and Progress · Design and Interiors
Tags: · , , , , , ,

Site visit (11 June) : the bejmat tiled floor is laid

Posted by Mikaela (Morocco based) on June 12th, 2009 · Leave a comment

On site yesterday the temperature was well up in the high 30’s, but inside the villas it was reassuringly cool.
We have a final decision on the colour and style of the outside render. Anwar was over from the UK and on site with me, so to be honest I’m glad he could see the options [...]

[Read the full article →]

Categories: Construction and Progress · Design and Interiors
Tags: · , , , ,

We are delighted to introduce a guest blogger…Maria Bazan

Posted by Maria Bazan on June 4th, 2009 · Leave a comment

I had been invited to visit L’Amandier for about three months and finally got there last Sunday. And now I wonder…why did it take me so long ? Just the thrill of leaving behind  the chaos of Marrakech gives you such a wonderful feeling of freedom that is hard to explain. It is just outside the red city that the excitement of the journey [...]

[Read the full article →]

Categories: Local Chatter
Tags: · , , , , , ,

Site visit (May 09)

Posted by Mikaela (Morocco based) on May 27th, 2009 · 2 Comments so far

The snow has almost disappeared from the surrounding mountains and the temperature has risen, but the flowers remain in full colour. And we’ve been snagging on site, and more.

I’m happy that the electrics are now positioned correctly and the bathroom countertops are at the correct height (ahem…we had to pull one down and start again…but [...]

[Read the full article →]

Categories: Construction and Progress · Uncategorized
Tags: · , ,

Site visit (31 March)

Posted by Mikaela (Morocco based) on March 31st, 2009 · Leave a comment

Spring has well and truely sprung in the Atlas mountains. From the brow of the hill, the L’Amandier plateau looked particularly stunning today as it was wearing a spring blanket of yellow wild flowers and scarlet poppies. Not something I was expecting at all.

And the villas are progressing. The exterior and interior walls are now [...]

[Read the full article →]

Categories: Construction and Progress
Tags: · , , , ,

  • Page 1 of 2
  • 1
  • 2
  • >